Unloading the new ceiling material: QuietRock.
Moving the QuietRock into the Church.
Staging the QuietRock in McBrier Chapel.
Painting the QuietRock. It will have to have 5 coats of paint to meet the specifications of the acoustic engineer.
Old ceiling panel removed in the aisles of the Nave. Looking upward into the above ceiling space.
Worker removing the old ceiling panels.
Debris from the old ceiling panels.
Looking at main ceiling in the Nave with the old ceiling panels removed. Notice how shallow the space is above the ceiling.
Some of the displacement of the stones in the arch at the Chancel.
A piece missing from the stone arch at the Chancel.
Removing the old ceiling panels in the East Transept creates lots and lots of dust and debris.
Worker pokes out old ceiling panel in the East Transept.
Looking downward into the Chancel from the "dance floor" level of the scaffolding.
This tiny entrance below the arch leads from the East Transept into Selden Chapel.