Installing the sound system speakers.
Installing the new sound system speakers.
Preparation of sections for the sound/lighting control booth.
Construction of the sound/lighting control booth in the balcony.
Construction of the sound/lighting control booth in the balcony.
Construction of the sound/lighting control booth in the balcony.
Construction of the sound/lighting control booth in the balcony.
Construction of the sound/lighting control booth in the balcony.
Detail of the sound isolation wall.
Notice the thickness of the glass of the sound isolation wall to minimize vibrations from the 32 foot organ pipes.
Sound isolation wall detail.
Sound isolation wall detail.
Compairson of the faux finish on the sound isolation wall frame (right) with the original stone (left).
Sound isolation wall detail.
Sound isolation wall detail on the Chancel.
Wall detail on the Chancel.
Installing glass pieces in the Baptistry screen.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Building the choir risers.
Installing sound deadening insulation in the choir risers.
Preparing the sound insulation for the choir risers.
Building the choir risers.
Installing sound deadening insulation in the choir risers.
Installing sound deadening insulation in the choir risers.
Installing sound deadening insulation in the choir risers.
Installing sound deadening insulation in the choir risers.
Installing sound deadening insulation in the choir risers.
Installing sound deadening insulation in the choir risers.
Final coat of floor finish.
Final coat of floor finish.
Brent Sesler removes years of wax and old grout from Chancel floor tiles.
Sound deflectors waiting installation.
Sound deflectors waiting installation.
Scott Sesler helps with cleaning.